Last Updated: 05/08/2024 类别:人行道 Category: 已缴纳的销售税 当前阶段: 设计开发
The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Last Updated: 05/07/2024 类别:巷道 当前阶段: Planning and Project Approval
Flamingo/Edgewater Widening
Last Updated: 05/07/2024 类别:巷道 当前阶段: 建设
The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, 海盗港, 林地地产, 道路及桥梁.Last Updated: 05/07/2024 Category: 已缴纳的销售税 类别:人行道 当前阶段: 设计开发
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Riverside Boat Ramp Replacement
Last Updated: 05/06/2024 Category: 公园和娱乐 当前阶段: 设计开发
作为CMP的一部分, 社区服务 is conducting structural assessments on all piers, 栈道, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Port Charlotte Beach 娱乐 Center
Last Updated: 05/06/2024 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: 设计开发
Design a new recreation center that will serve the current needs of rental venue for events, as well as community facilities for sailing and regatta events.Landfill Scale House (Zemel 路)
Last Updated: 05/06/2024 Category: 县设施 当前阶段: 建设
The scale house at the Zemel 路 Landfill is currently a trailer nearing end of expected usable lifecycle. 另外, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Last Updated: 05/06/2024 当前阶段: Planning and Project Approval
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach an collaborative problem solving to ensure timely protective actions, 受过更多教育的人, informed and prepared population and resilient infrastructure.